The Zlatné bridge - condition survey, temporary remedial works required due to dangerous condition and bridge restoration project

Peter Koteš Mail
University of Žilina, Civil Engineering Faculty, 8215/1 Univerzitná Street, 010 26 Žilina
Miroslav Brodňan Mail
University of Žilina, Civil Engineering Faculty, 8215/1 Univerzitná Street, 010 26 Žilina
Milan Chandoga Mail
Projstar-PK Ltd., 1 Nad ostrovom Street, 841 04 Bratislava
Tatiana Bacíková Mail
Valbek Ltd., 11 Kutuzovova Street, 831 03 Bratislava
Wojciech Kubissa Mail
Warsaw University of Technology, Faculty of Civil Engineering, Mechanics and Petrochemistry, 17 Łukasiewicza Street, 09-400 Płock
Published: 2017-09-30

Abstract

Bridges are and have been designed on lifetime basis, as given in standards applicable at the time of design. The design lifetime for newly designed bridges as given in Eurocodes is 100 years and according to the old Slovak standard it was 80 years only. The first generation of prestressed concrete bridges have been used in Slovakia (formerly part of Czechoslovakia) starting from 1950s, and thus, according to old standards, they approach the end of their design lifetime. Nowadays, due to insufficient maintenance, many of them are in unsatisfactory condition. This paper focuses on the condition survey of the bridge on the road No. I/18 - in the part “Zlatné” of village Strečno and on the design of immediate remedial works which were necessary due to its potentially dangerous condition. Moreover, the design of restoration is also described.

Keywords


bridge, concrete, condition survey, dangerous condition, monitoring, prestressing, restoration

Full Text:

PDF

References


SSC: National traffic census 2010 - Žilina country. Table and graphic form. 2012 (in Slovak)

Vičan J., Odrobiňák J., Gocál J., Hlinka R.: Remarks from diagnostics and load carrying capacity estimation of existing railway bridges. In: Proceedings of 8th International conference on short and medium span bridges, Niagara Falls. The Canadian Society for Civil Engineering, Montréal, Québec, Canada, 2010, 150-1/150-9

Guo T., Chen Z., Liu T., Han D.: Time-dependent reliability of strengthened PSC box-girder bridge using phased and incremental static analyses. Engineering Structures, 117, 2016, 358-371

Šomodíková M., Lehký D., Doležel J., Novák D.: Modeling of degradation processes in concrete: Probabilistic lifetime and load-bearing capacity assessment of existing reinforces concrete bridges. Engineering Structures, 119, 2016, 49-60

Furuta H., Akiyama M.: Life-cycle of structural systems: design, assessment, maintenance and management. Structure and Infrastructure Engineering, 13, 1, 2017, 1-1

Biondini F., Frangopol D.M.: Time-variant redundancy and failure times of deteriorating concrete structures considering multiple limit states. Structure and Infrastructure Engineering, 13, 1, 2017, 94-106

Caprani C.C., Obrien E.J., Lipari A.: Long-span bridge traffic loading based on multi-lane traffic. Engineering Structures, 115, 2016, 207-219

Kim S., Frangopol D.M.: Efficient multi-objective optimisation of probabilistic service life management. Structure and Infrastructure Engineering, 13, 1, 2017, 147-159

Antucheviciene J., Kala Z., Marzouk M., Vaidogas E.R.: Decision Making Methods and Applications in Civil Engineering. Mathematical Problems in Engineering, Article number 160569, 2015

Biondini F., Strauss A.: Life-cycle performance of civil infrastructure systems. Structure and Infrastructure Engineering, 12, 7, 2016, 801-801

Zemko Š., Koteš P.: Analysis and development of optimal way of superstructure rehabilitation of Bridge “Zlatné” number 018-264. KSKM, Civil Engineering Faculty, University of Žilina, 02/2012 (in Slovak)

Zemko Š., Koteš P., Brodňan M., Bahleda F.: Report about diagnostic and recalculation of Bridge “Zlatné” number 018-264 on state road I/18. Civil Engineering Faculty, University of Žilina, 11/2011 (in Slovak)

Zemko Š., Koteš P.: Report about emergency state and another procedure of solving of bridge “Zlatné” number 018-264 on state road I/18. Civil Engineering Faculty, University of Žilina, 01/2012 (in Slovak)

Rehman S.K.U., Ibrahim Z., Memon S.A., Jameel M.: Nondestructive test methods for concrete bridges: A review. Construction and Building Materials, 107, 2016, 58-86

Cikrle P.: Importance of non-destructive diagnostic methods for surveying steel-reinforced concrete structures. Habilitation thesis, Brno University of Technology, Brno, Czech Republic, 2016

TP 9B/2005: Inspections, maintenance and repairs of roads. Bridges. Technical provisions. MDPaT SR, 2005 (in Slovak)

Chandoga M., Jaroševič A.: The completion of the design and realization documentation of prestressing elements by focusing on a Bridge “Zlatné”. The report on the measurement and prestressing forces of prestressing strands: Reconstruction of hinge joint - Bridge “Zlatné”. Final reports PROJSTAR-PK Ltd., March 2012 (in Slovak)

Koteš P., Chandoga M., Jaroševič A.: Solution of emergency state of bridge Zlatné. Conference proceedings “Betonárske dni 2012”, Bratislava, 2012, 403-408 (in Slovak)


The Zlatné bridge - condition survey, temporary remedial works required due to dangerous condition and bridge restoration project

  
Koteš, Peter et al. The Zlatné bridge - condition survey, temporary remedial works required due to dangerous condition and bridge restoration project. Roads and Bridges - Drogi i Mosty, [S.l.], v. 16, n. 3, p. 177-190, sep. 2017. ISSN 2449-769X. Available at: <>. Date accessed: 29 Mar. 2024. doi:http://dx.doi.org/10.7409/rabdim.017.012.