The article analyses the causes of the Morandi viaduct disaster in Genoa. This three-span viaduct was a part of the A10 motorway leading to Savona. The structure of the viaduct supports was unusual. A pylon to each of the frame support was added and cantilevers to each pylon by means of a pair of suspended cables. The construction of the cable used was also atypical. The concreted cable had a rectangular cross-section and was a steel and concrete composite element. The concrete in this element was compressed with steel tendons so that it could transfer the tensile forces generated by the traffic load. The durability of the concreted cable subjected to tension was low. The article provides information on the technical condition of the viaduct and the way of strengthening the cables in the early 1990s. At that time, the author of the article visited this structure. He had a different concept of reinforcement than the one that was implemented. In August 2018, the viaduct disaster occurred, as a result of which one of the structure supports collapsed, and in June 2019, during the demolition process, the other two supports were blown up. Since in Venezuela and Libya there are still two more bridges with a structure similar to that in Italy, the concept of reinforcing them, as proposed by the author of the article 25 years ago, may still be useful.

Keywords


disaster of viaduct Polcevera, large pre-stressed bridge structures, Prof. Morandi.

Full Text:

PDF

References


Morandi R.: Viaducto sobre el Polcevera, en Genova - Italia, Informes de la Construcción, Vol. 21, No. 200, 1968, 57-88

Podolny W. Jr.: Concrete cable-stayed bridges. Transportation Research Record, No. 665, 1978, 121-130, http://onlinepubs.trb.org/Onlinepubs/trr/1978/665v2/665v2-015.pdf (14.11,2019)

Autostrada Genova-Savona Viadotto Polcevera: lavori di risanamento della pila. Lavori eseguiti da Italstrade a tutto il 29 Febbraino 1988

Wicke M.: Interim report on the corrosion damage to the pre-stressing steel on the “Viadotto sul Polcevera”. Genua, Innsbruck, 29.01.1992

Wicke M.: The 2 Report on the Polcevera Viaduct. Innsbruck, 06.03.1992

Camomilla G., Martinez y Cabrera F., Pisani F., Marioni A.: Repair of the stay cables of the Polcevera Viaduct in Genova, Italy. IABSE Reports, Zürich, 73//1, 1995, 535-540

Biliszczuk J., Teichgraeber M.: O katastrofie wiaduktu Polcevera w Genui, we Włoszech. Inżynieria i Budownictwo, 74, 11, 2018, 578-582

Kossakowski P.: Zagadnienia nośności stalowych mostów kolejowych poddanych wieloletniej eksploatacji w ujęciu norm Eurokod. Roads and Bridges - Drogi i Mosty, 13, 2, 2014, 115-130, DOI: 10.7409/rabdim.014.008

Wichtowski B.: Nośność stalowych mostów kolejowych z drugiej połowy XIX wieku - uwagi dyskusyjne. Roads and Bridges - Drogi i Mosty, 13, 3, 2014, 261-269, DOI: 10.7409/rabdim.014.017

Cieśla J., Biskup M., Topczewski Ł., Skawiński M.: Przypadki awarii obiektów mostowych w trakcie procesu sprężania. Roads and Bridges - Drogi i Mosty, 16, 1, 2017, 15-35, DOI: 10.7409/rabdim.017.002

PN-EN 1990:2004 Eurokod - Podstawy projektowania konstrukcji


Causes of the Morandi viaduct disaster in Genoa as a contribution to the design of pre-stressed structures

  
Rymsza, Janusz. Causes of the Morandi viaduct disaster in Genoa as a contribution to the design of pre-stressed structures. Roads and Bridges - Drogi i Mosty, [S.l.], v. 19, n. 1, p. 5-25, mar. 2020. ISSN 2449-769X. Available at: <>. Date accessed: 28 Mar. 2024. doi:http://dx.doi.org/10.7409//rabdim.020.001.